Telephone
Insulated Liquid System

Community Centre

Thetford
Community Centre
Community Centre
Community Centre

Community Centre

Thetford community centre is the hub where many local clubs and societies hold their meetings. When they discovered that their old EPDM roof was failing, they called us. We carried out a full survey of the roof and recommended that the failed EPDM roof be replaced with an insulated liquid system. This would bring the building into compliance with Part L of the building code – the part that deals with thermal efficiency. The new insulated roof would mean less heat would be lost when the building was being heated in winter.

We also recommended that a previous asphalt covering that had not failed be left in place as a vapour control layer. This would help protect the building from the consequences of a build-up of condensation.

Book a Survey

To arrange an inspection of your flat roof at a time and date that is convenient for you, simply call us on 01603 418818, drop us an email to enquiries@roofsuk.co.uk or leave us a message using the form.